Customization: | Available |
---|---|
Warranty: | Yes |
Certification: | ISO, CE |
Still deciding? Get samples of US$ 2.5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Application | Pitch Roof |
Modules Layout | According to Requirements |
Module Inclination | Parral to the roof |
Snow Load | 1.4KN/M² |
Wind load | Up to 42m/s |
Building Height | Up to 20m |
Standards | JIS 8955:2017/DIN1055/ASCE_ 7-05/AS-NZS 1170 |
Warranty | 10 Years |
Color | Natural |
Step 1: Preparation
Ensure you have all the necessary tools and equipment. Put on your safety gear, including gloves and goggles, to protect yourself during the installation.
Step 2: Roof Assessment
Inspect your roof to determine the ideal locations for installing the solar hooks. Take into account factors such as the orientation of the roof, available sunlight, and the desired angle of the solar panels. It's crucial to position the hooks where they can support the weight of the panels and maximize solar exposure.
Step 3: Marking the Placement
Mark the spots on the roof where you'll install the solar hooks. Measure and ensure proper spacing between the hooks according to your specific solar panel layout and manufacturer's recommendations.
Step 4: Drilling Holes
Using an appropriate drill bit, create holes in the marked spots. The size of the drill bit should match the specifications provided by the solar hook manufacturer. Ensure that the holes penetrate through the roofing material and into the rafters or studs for secure attachment.
Step 5: Installing Roofing Anchors
If your roof requires additional support, install roofing anchors or lag bolts into the pre-drilled holes. These anchors will provide extra stability and ensure the hooks are securely attached to the roof structure.
Step 6: Attaching the Solar Hooks
Position the solar hooks over the drilled holes or roofing anchors and align them properly. Insert the provided screws or bolts through the holes in the hooks and tighten them with a wrench or screwdriver. Ensure the hooks are firmly attached to the roof.
Step 7: Applying Flashing
To prevent water leakage, apply waterproof flashing around the base of each solar hook. The flashing should cover the area where the hook meets the roof, creating a watertight seal. Use a suitable sealant or roofing adhesive to secure the flashing in place.
Step 8: Final Checks
Inspect the installed solar hooks to ensure they are secure and properly aligned. Double-check that the flashing is correctly sealed to prevent any potential leaks. Make any necessary adjustments or re-tighten screws if needed.
With 12 years fabrication experience, Alv factory proudly introduce us as one of the leading and professional for making stainless steel tile roof hook at China Xiamen ctiy, All of raw material are all super quality Stainless steel 304 (small part of 306 316 etc). Many modern advanced production equipment and machines and tools are maintained strictly under the the system of ISO9001. Our weekly output averaged at 90000 sets ( 3*20 Fcls), so no doubt , you can have best price and fast delivery for all kinds of solar roof tiles here, such as :
Provide OEM & ODM service
Plain & Sand Blasting surface
Lead Time: 7-10 days
Free sample: Freight collected
Supply Capacity: 90,000 sets a week
9 pallets / 1*20 TEU / 30000 sets / 20 tons
1. How to choose the right hooks
Depend on the tile and solar panel. Our engineers can offer suggestions if you provide with the specification of the tile roof and the spec of the solar panel. Dual adjustable solar tile hook is the most widely applicable design.
2. Do you have OEM service?
Yes, OEM & ODM service available. We have hundred of solar tile roof hook designs in stock.
3 Do you provide samples ?
Yes, samples are free and your account for the delivery charge.
4 Your delivery time?
Delivery can be made within 2 days if stock available after receive the payment.
Mass production 7- 10 days after receive the deposit.
5 How to guarantee the quality?
1. The counter samples confirmed and sealed by both sides before bulk production.
2.The production proceed the producing process strictly according the required loop.
3. QC check every production step, including incoming material inspection, on-site inspection and final inspection.
6 What is your payment terms?
Usually 30% T/T deposit in advance, the balance against the copy of B/L.